müba scaffolding - your professionel for construction and scaffold equipment
 
 
German English French Netherlands Polish Russian Lithuanian Slovak Czech
Home Home    Sitemap Sitemap    bookmark bookmark You are here: Products

     
  News
 Products
  Brochures
  About us
  Contacts
  The way to us
  Contact form
  Sitemap
  Impressum
  Privacy policy
 
 
  Search:
 
 

  Extended
  article search >>>





 
  

Monday,
09.12.2019
22:11:25

 
Start
 
  Products
 
  Products  Formwork equipment  Formwork rail and handrail post
 
The ceiling edge formwork is used as edge formwork in the production of concrete ceilings in multi-storey buildings. With the side protection boards, the handrail post provides the protection against falls required by the accident prevention regulation BGV C22. The system meets the requirements stipulated in the “Principles for Checking Side Protection Components and Roof Protection Walls“ BGG 928(04/1994).
The formwork rail replaces the customary and time-consuming installation of squared timber. The formwork rail is fastened with a tie rod (e.g. DW 15), which is guided through the concrete wall, and clamping nuts. The tie rod must be led through in the upper half of the formwork rail. The handrail post is attached to the formwork rail. The threepart side protection is completed with 15 x 3 cm boards. A 4.5 cm thick plank can be attached as edge formwork.

Order no. Description
11280 Formwork rail


© 2019 by müba  mail to mueba